Hines UK
46,000 sq ft Cat A office space fit out for and reception refurbishment
Scope Of Works
Suspended Ceiling & Drylining Package
New SAS system 330 ceilings with plasterboard margins and integral blind boxes were installed on generic floors. Plasterboard ceilings with recessed lighting was installed to the reception areas and existing walls were relined and constructed to allow feature media wall to be incorporated.
MAIN CONTRACTOR: ISG Plc
ARCHITECT: John Robertson Architects
PROJECT VALUE: £460,000.00