Building 100 consisted of Feature plasterboard bulkheads & ceilings incorporating recessed lighting to meeting room and corridor areas. An extensive area of plasterboard ceiling was installed to the reception incorporating a circular vaulted GRG coffer. SAS System 150 was installed to kitchen areas with SAS System 130 installed to back of house areas.
Building 80 consisted of extensive areas of SAS Acoustic Baffle 500 & 600 System ceilings. SAS Systems 130, 150 & 330 ceilings and plasterboard bulkheads & margins were installed to various other areas.