99 Bishopsgate

Scope of works
  • Suspended Ceiling and Dry Lining package
  • Installation of new SAS 330 System ceiling with Fire Barriers installed within the ceiling void. Plasterboard margins to the external & internal elevations, the external margin incorporating a recessed ‘Blind Box’ detail.
  • Relining of existing core wall & perimeter columns including re-construction of Shaftwall service ducts.
  • New WC’s were constructed within the existing cores with drywall partitions, gyplyner wall linings & plasterboard ceilings.
  • The Goods lift lobby area were also refurbished with re-lining of walls and installation of bespoke metal plank tile ceiling.

Brookfield Properties

9,000 sq. ft. fit-out as a Show Floor for potential tenants.

MAIN CONTRACTOR: ISG Plc

ARCHITECT: HLW International LLP

PROJECT VALUE: £150,000.00